Results tenders

2,904 tenders found for “water supply”.

Value ₹ EMD ₹
Construction work of toilet and other necessary works next to the Kotwali Police Station, under Hanumantal Ward (Division No. 08)
expired
Directorate Urban Administration and Development||Muncipal Corporations - UAD||Muncipal Corporation-Jabalpur - UAD||Water Supply (PHE) Deptt. - MC Jabalpur - UAD
Result awaited ₹1,692,000 Jabalpur 2026_UAD_523690_1 21 Aug 2026, 05:30 PM
Road construction work at various locations within the Sarvepalli Dr. Radhakrishnan Ward. (Councilor recommendation)
expired
Directorate Urban Administration and Development||Muncipal Corporations - UAD||Muncipal Corporation-Jabalpur - UAD||Water Supply (PHE) Deptt. - MC Jabalpur - UAD
Result awaited ₹1,268,000 Jabalpur 2026_UAD_514924_1 21 Aug 2026, 05:30 PM
Water Supply Material Work
expired
Directorate Urban Administration and Development||Join Director-Gwalior Division - UAD||Shivpuri-Nagar Parishad Pohari
Result awaited ₹500,000 Pohri 2026_UAD_527791_1 21 Aug 2026, 05:30 PM
Survey and Design of Distribution network for water supply from RCC Overhead tanks/ Ground Level Service Reservoirs/Sump-wells including Providing, Laying, Testing and Commissioning of pipelines to be laid under this contract in different DMAs (Distr
expired
Directorate Urban Administration and Development
Result awaited ₹19,880,365 PHE Department 2026_UAD_527271_1 21 Aug 2026, 05:30 PM
Providing and Fixing Booster Pump with Labor and Material at Site Ward No. 52, Gudha Puliya etc.. File No. 110/26X9/1
expired
Directorate Urban Administration and Development||Muncipal Corporations - UAD||Muncipal Corporation-Gwalior - UAD||Water Supply (PHE) Deptt. - MC Gwalior - UAD
Result awaited ₹251,850 PHE Department 2026_UAD_527291_1 21 Aug 2026, 05:30 PM
Drilling, Installation, Jointing and Commissioning of 3 nos. tubewell along with laying of DI water supply pipe in Old Dalbir Nagar in ward 12 M.C. Panipat. ONLY FOR L/C SOCITIES
expired
Haryana Government
Result awaited ₹3,610,403 Panipat 2026_HRY_541222_1 21 Aug 2026, 05:00 PM
Annual painting D.G. Substation, water supply, shree durga Mandir, shiv mandir and different other places on the occasion of Durga Puja, Vishwakarma puja and chhat puja in the year 2026-27 at CCWO colony, Saraidhela, Dhanbad.
expired
Bharat Coking Coal Limited
Result awaited ₹487,630 CCWO Colony, Saraidhela, Dhanbad 2026_BCCL_363231_1 21 Aug 2026, 05:00 PM
Restoration of water supply scheme Bagwani Batpora affected due to floods of July 2026 (Under SDRF)
expired
PHE
Result awaited ₹87,000 Bijehara 2026_PHE_320899_10 21 Aug 2026, 04:00 PM
Restoration of water supply scheme Halmullah Cherward by way of restoration of head works, desilting of storages due to flood and removal of blockages from Raw Water
expired
PHE
Result awaited ₹195,600 Bijehara 2026_PHE_320899_8 21 Aug 2026, 04:00 PM
Restoration of water supply scheme Yal Dangerpora by restoration of head works, desilting of storages accumulated due to flood and removal of blockages from Raw Water Main damaged due to incessant rains of July 2026 (Under SDRF).
expired
PHE
Result awaited ₹192,000 Bijehara 2026_PHE_320899_6 21 Aug 2026, 04:00 PM
Restoration of water supply scheme Logripra damaged due to heavy rainfall during the month of July 2026 (Under SDRF).
expired
PHE
Result awaited ₹180,400 Bijehara 2026_PHE_320899_5 21 Aug 2026, 04:00 PM
Restoration of water supply scheme Wagad damaged due to heavy rainfall during the month of July 2026 (Under SDRF)..
expired
PHE
Result awaited ₹112,000 Bijehara 2026_PHE_320899_4 21 Aug 2026, 04:00 PM
Restoration of water supply scheme Nallah Awoora by way of L/F of 110 mm dia HDPE RWM affected due to cloud burst/ floods of July 2026 (Under SDRF)
expired
PHE
Result awaited ₹74,000 Bijehara 2026_PHE_320899_9 21 Aug 2026, 04:00 PM
Restoration of water supply scheme Amar Grend damaged due to heavy rainfall during the month of July 2026 (Under SDRF).
expired
PHE
Result awaited ₹193,000 Bijbehara 2026_PHE_320899_3 21 Aug 2026, 04:00 PM
Restoration of headworks of water supply scheme Gadool and Ichoo by way of engagement of JCB/welder and Laying in position DI pipes ,Fabrication of trash guards for Various water supply schemes damaged due to floods of 20th-26th july 2026 (Un
expired
PHE
Result awaited ₹69,600 Bijehara 2026_PHE_320899_1 21 Aug 2026, 04:00 PM
Restoration of water supply scheme Upgradation Salia by way of desilting of storages accumulated due to incessant rains of July 2026 (Under SDRF)
expired
PHE
Result awaited ₹195,000 Bijehara 2026_PHE_320899_7 21 Aug 2026, 04:00 PM
Sub Work Balance work for Augmentation of Water supply system at Sooramangalam Village and adjacent areas in Nettapakkam
expired
Public Works Department
Result awaited ₹11,833,476 PHD Office, Uppalam, PWD, Puducherry 2026_PWDC2_22698_1 21 Aug 2026, 04:00 PM
Provision of Drinking water supply for 33/11kv R/station Dharmound
expired
Jkspdc
Result awaited ₹799,941 chanderkote 2026_SPDC_318746_1 21 Aug 2026, 04:00 PM
Providing and Laying of Water Supply D Main Pipeline in Arun Nagar at Ward No.15 in GMC
expired
MAWS||Kudiyatham Municipality
Result awaited ₹350,000 Gudiyatham Municipality 2026_MAWS_689857_1 21 Aug 2026, 03:00 PM
Providing and Laying of Water Supply D Main Pipeline in Thirumalai Nagar, Sathani Gopalan Street, Alathur Dhathamiyan Street Sheriff Nagar, Gosha Gulamudeen Street at Ward No.1,9,15 in GMC
expired
MAWS||Kudiyatham Municipality
Result awaited ₹400,000 Gudiyatham Municipality 2026_MAWS_689863_1 21 Aug 2026, 03:00 PM
← Prev Page 42 of 146 Next →