Live tenders

348 tenders found for “bridge”.

Value ₹ EMD ₹
Restoration of Bukhari Bridge Dringla Teetwal Road
live
PWD
Closes in 11 days ₹500,000 tangdar 2026_PWDJK_324278_4 24 Sep 2026, 04:00 PM
Improvement to Service Road of Dunato Right embankment near Gambhari Bridge (From RD 3100.00m to 4000.00m) for the year 2026-27
live
Ce-Bm,Lmb Basin,Bbsr
Closes in 10 days Nayagarh 2026_CELBB_140656_17 23 Sep 2026, 05:00 PM
Protection to Kusumi right embankment near PWD road to Banamalipur Bridge RD 3000m to 5200m
live
Ce-Bm,Lmb Basin,Bbsr
Closes in 10 days Nayagarh 2026_CELBB_140656_4 23 Sep 2026, 05:00 PM
Improvement to Kuanria right embankment from Benagadia Bridge to Pathardwar RD 0.00m to 1550.00m for the year 2026-27
live
Ce-Bm,Lmb Basin,Bbsr
Closes in 10 days 2026_CELBB_140656_22 23 Sep 2026, 05:00 PM
Reconstruction of VR Bridge at RD 24800, RD 97620 and Construction of VR Bridge at RD 39800, Trash Rack at RD 45500 and Additional Bay and Repair and maintenance of pump houses of Badhwana disty
live
Haryana Government
Closes in 11 days ₹45,029,295 Charkhi Dadri 2026_HRY_546460_1 24 Sep 2026, 06:00 PM
Restoration to scoured bank near Pratapnagari Bridge of Kuakhai Right Embankment
live
Ce-Bm,Lmb Basin,Bbsr
Closes in 15 days 2026_CELBB_140687_28 28 Sep 2026, 05:30 PM
Construction of Minor Bridge D/S of Tapovan Reservoir at Ch-870 m and 990 m At Nimbhora Taluka- Kannad Dist. Chhatrapati Sambhajinagar
live
CE and CA CADA Aurangabad
Closes in 5 days ₹42,702,000 Kannad 2026_CCCA_1337883_1 18 Sep 2026, 06:15 PM
KID-116 Protection to scoured bank on Nuna right Embankment U/S of Nuna Bridge near village Badapal
live
Ce and BM Mbbs Chandikole
Closes in 9 days 2026_KIRRD_140699_8 22 Sep 2026, 01:00 PM
KID-139 Construction of left bank guard wall from RD 12.170 to 12.230 Km., Guard wall from Rd 13.590 Km. to 13.630 Km. and foot bridge at RD 10.150 Km near village Kurujanga of disty.no.9 of Kendrapara Canal.
live
Ce and BM Mbbs Chandikole
Closes in 9 days ₹1,969,497 Kendrapara 2026_KIRRD_140710_22 22 Sep 2026, 01:00 PM
KID-184 Construction of VRB on Disty.no.8 at RD 8.400 Km with with foot bridge on Haladiapatna Minor and Pallipatna with Kumbhara Sahi Gada of Pattamundai Canal.
live
Ce and BM Mbbs Chandikole
Closes in 9 days ₹4,970,918 Kendrapara 2026_KIRRD_140710_67 22 Sep 2026, 01:00 PM
KID-117 Construction of Box Bridges across the Gobari Canal to connect from Fakirabad to Jamiama AU Islamic University road
live
Ce and BM Mbbs Chandikole
Closes in 9 days ₹8,309,993 Kendrapara 2026_KIRRD_140699_9 22 Sep 2026, 01:00 PM
e- Quotation for Construction of Platform for Weigh Bridge and Operator Room With Toilet Near 1500MT Grain Godown in Block- MAHESHPUR, District-PAKUR for the year 2026-27
live
Bcd Einc
Closes in 6 days ₹0 Maheshpur 2026_BCD_117345_2 19 Sep 2026, 05:00 PM
e- Quotation for Construction of Platform for Weigh Bridge and Operator Room With Toilet Near 1500MT Grain Godown in Block- PAKUR, District-PAKUR for the year 2026-27
live
Bcd Einc
Closes in 6 days ₹0 Pakur 2026_BCD_117345_1 19 Sep 2026, 05:00 PM
Construction of Stair steps /CC path from main road steel bridge via Mohd Abdullah to Masjid Sharief Chorwan Gurez
live
PWD
Closes in 3 days ₹200,000 Gurez 2026_PWDJK_324254_1 16 Sep 2026, 04:00 PM
Upgradation of Culvert with wing walls at Achoora Bridge Gurez
live
PWD
Closes in 3 days ₹399,000 Gurez 2026_PWDJK_324254_4 16 Sep 2026, 04:00 PM
Construction of Wooden Foot Bridge Span 65 Ft at Dund Nallah Renai Wildlife Chenab Division Kishtwar for the Year 2026 27
live
Forest Department
Closes in 13 days ₹999,881 Dund Renai 2026_FD_324264_1 26 Sep 2026, 04:00 PM
Repairing of road from checkpost no 3 to Dhawaiyya bridge under Rajrappa Project
live
Central Coalfields Limited
Closes in 8 days ₹302,375 Rajrappa Area 2026_CCL_365319_1 21 Sep 2026, 05:00 PM
Providing Structural and Architectural consultancy for Construction of 50 meter Foot Bridge at Sarola at Lowang under NABARD RIDF-XXXII.
live
PWD
Closes in 8 days ₹260,000 Basohli 2026_PWDJK_324210_2 21 Sep 2026, 04:00 PM
Providing Structural and Architectural consultancy for Construction of Drabal Foot Bridge under NABARD RIDF-XXXII.
live
PWD
Closes in 8 days ₹200,000 Basohli 2026_PWDJK_324210_3 21 Sep 2026, 04:00 PM
Providing Structural and Architectural consultancy for Construction of 50 meter Foot Bridge at Chounchli nallah at Lowang under NABARD RIDF-XXXII.
live
PWD
Closes in 8 days ₹260,000 Basohli 2026_PWDJK_324210_1 21 Sep 2026, 04:00 PM
← Prev Page 4 of 18 Next →