Live tenders

482 tenders found for “irrigation”.

Value ₹ EMD ₹
Construction of Canal Service Road of Narsinghpur Branch Canal from RD 13370m to 19565m of Rengali Right Irrigation Project
live
CE-BM,B Right Basin,Dhenkanal
Closes in 5 days ₹16,931,256 Panchagaon, Sudershanpur, Tigiria Nizigarh, Karada 2026_CEBMD_134507_1 27 Jul 2026, 05:00 PM
Construction of Cross Drainage from RD 47.532 KM to RD 48.633Km of Darpani Branch Canal of Rengali Right Irrigation Project
live
CE-BM,B Right Basin,Dhenkanal
Closes in 5 days ₹63,845,454 Gobara and Dampatipur 2026_CEBMD_134507_3 27 Jul 2026, 05:00 PM
Selection of ISP for the development of Pressurized Piped Irrigation Network (PPIN) and provision of irrigation services in MCAD Cluster-V with intake points on Lower Indra reservoir having CCA 2580 Ha. in Nuapada distr
live
CE Megalift Projects Bhubaneswar
Closes in 5 days Khariar,Komna Selection of ISP for the development of Pressurized Piped Irrigation Network (PPIN) and provision of irrigation services in MCAD Cluster-V with intake points on Lower Indra reservoir having CCA 2580 Ha. in Nuapada distr 27 Jul 2026, 05:00 PM
Improvement of Service road from RD 22.900Km to 30.210 Km including missing Link 130m of Narsinghpur Branch Canal of Rengali Right Irrigation Project
live
CE-BM,B Right Basin,Dhenkanal||SE, Irr.Circle, Dhenkanal||EE,Rengali Right Canal Divn No. IV
Closes in 5 days ₹26,219,421 Gokarnakhal, Budhapanka, Kuanarapala, Godipatana, Improvement of Service road from RD 22.900Km to 30.210 Km including missing Link 130m of Narsinghpur Branch Canal of Rengali Right Irrigation Project 27 Jul 2026, 05:00 PM
Construction of Canal Service Road of Narsinghpur Branch Canal from RD 13370m to 19565m of Rengali Right Irrigation Project
live
CE-BM,B Right Basin,Dhenkanal||SE, Irr.Circle, Dhenkanal||EE,Rengali Right Canal Divn No. IV
Closes in 5 days ₹16,931,256 Panchagaon, Sudershanpur, Tigiria Nizigarh, Karada Construction of Canal Service Road of Narsinghpur Branch Canal from RD 13370m to 19565m of Rengali Right Irrigation Project 27 Jul 2026, 05:00 PM
Construction of Cross Drainage from RD 47.532 KM to RD 48.633Km of Darpani Branch Canal of Rengali Right Irrigation Project
live
CE-BM,B Right Basin,Dhenkanal||SE, Irr.Circle, Dhenkanal||EE,Rengali Right Canal Divn No. IV
Closes in 5 days ₹63,845,454 Gobara and Dampatipur Construction of Cross Drainage from RD 47.532 KM to RD 48.633Km of Darpani Branch Canal of Rengali Right Irrigation Project 27 Jul 2026, 05:00 PM
Replacement of 500 mm dia existing damaged delivery pipe of VT Pumps by providing and fitting of new delivery pipe for 02 No. pumping unit at lift irrigation scheme Tokina.
live
I and FC
Closes in 6 days ₹94,700 Tokina 2026_IFC_314808_4 28 Jul 2026, 11:00 AM
Replacement of 500 mm dia existing damaged delivery pipe of VT Pumps by providing and fitting of new delivery pipe for 02 No. pumping unit at lift irrigation scheme Tokina.
live
I and FC||CE - I and FC Kashmir||Mechanical Circle Srinagar||Mechanical Division Anantnag
Closes in 6 days ₹94,700 Tokina Replacement of 500 mm dia existing damaged delivery pipe of VT Pumps by providing and fitting of new delivery pipe for 02 No. pumping unit at lift irrigation scheme Tokina. 28 Jul 2026, 11:00 AM
Development Of Fisheries and Other Aquaculture Activities
live
CE-Water Resources Dept. Pune||SE Command Area Development Authority Solapur||EE Solapur Irrigation Division Solapur
Closes in 14 days ₹0 Ekrukh Dam Development Of Fisheries and Other Aquaculture Activities 05 Aug 2026, 01:05 PM
Floating Solar PV Battery Energy Storage System FSPV BESS
live
CE-Water Resources Dept. Pune||SE Command Area Development Authority Solapur||EE Solapur Irrigation Division Solapur
Closes in 14 days ₹0 Ekrukh Dam Floating Solar PV Battery Energy Storage System FSPV BESS 05 Aug 2026, 12:50 PM
Construction of Gravity Closed Pipeline Distribution System from the Head Regulator of Padmalaya-II Dam for a Command Area of 1982 Ha. (ICA/CCA) under Padmalaya Lift Irrigation Scheme, Tal. Erandol, Dist. Jalgaon.
live
CE Tapi Irrigation Development Corporation Jalgaon
Closes in 2 days ₹656,764,775 Padmalaya Lift Irrigation Scheme, Tal. Erandol, Di 2026_TIDC_1314688_1 24 Jul 2026, 06:15 PM
Construction of Distribution system for 4924.04 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 49.810 km to 59.970 km through Under Ground Pipe Line Irrigation system (Gravity Flow) of Anandapur Barrage Project
live
CCE,Anandapur Barrage Project
Closes in 6 days Cce Abp, Salapada 2026_CCEAB_134255_1 28 Jul 2026, 05:00 PM
Construction of Distribution system for 4924.04 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 49.810 km to 59.970 km through Under Ground Pipe Line Irrigation system (Gravity Flow) of Anandapur Barrage Project
live
CCE,Anandapur Barrage Project||CCE,Anandapur
Closes in 6 days Cce Abp, Salapada Construction of Distribution system for 4924.04 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 49.810 km to 59.970 km through Under Ground Pipe Line Irrigation system (Gravity Flow) of Anandapur Barrage Project 28 Jul 2026, 05:00 PM
Laying of crates on left side of Sukhnag Nallah near Supply Channel Zamindari Khul Banjar Akhoon Khul at Rathsun.
live
I and FC||CE - I and FC Kashmir||HYD Circle Budgam||Irrigation FSC Narbal
Closes in 2 days ₹202,000 Narbal Laying of crates on left side of Sukhnag Nallah near Supply Channel Zamindari Khul Banjar Akhoon Khul at Rathsun. 24 Jul 2026, 02:00 PM
Construction of toe wall on outer slope of left embankment of Sukhnag Nallah at Dooni Mohalla Checki Kawoosa Near Masjid Sharief.
live
I and FC||CE - I and FC Kashmir||HYD Circle Budgam||Irrigation FSC Narbal
Closes in 2 days ₹206,000 Narbal Construction of toe wall on outer slope of left embankment of Sukhnag Nallah at Dooni Mohalla Checki Kawoosa Near Masjid Sharief. 24 Jul 2026, 02:00 PM
Construction of baricade on FSC at Shariefabad.
live
I and FC||CE - I and FC Kashmir||HYD Circle Budgam||Irrigation FSC Narbal
Closes in 2 days ₹59,000 Narbal Construction of baricade on FSC at Shariefabad. 24 Jul 2026, 02:00 PM
Extension of spindal rod by welding including greasing of 07 No. Existing sluice pipes at Shariefabdad.
live
I and FC||CE - I and FC Kashmir||HYD Circle Budgam||Irrigation FSC Narbal
Closes in 2 days ₹59,000 Narbal Extension of spindal rod by welding including greasing of 07 No. Existing sluice pipes at Shariefabdad. 24 Jul 2026, 02:00 PM
Clearance of Chaksi Nallah.
live
I and FC||CE - I and FC Kashmir||HYD Circle Budgam||Irrigation FSC Narbal
Closes in 2 days ₹201,000 Narbal Clearance of Chaksi Nallah. 24 Jul 2026, 02:00 PM
Installation of gauge at various bridges within the jurisdiction of flood spill channel.
live
I and FC||CE - I and FC Kashmir||HYD Circle Budgam||Irrigation FSC Narbal
Closes in 2 days ₹109,000 Narbal Installation of gauge at various bridges within the jurisdiction of flood spill channel. 24 Jul 2026, 02:00 PM
Desilting the Pillayarkuppam Authuvoikkal from Pillayarkuppam Anicut to Pathukannu Junction in Oussudu Constituency, Puducherry.
live
Public Works Department||CIRCLE II||IRRIGATION
Closes today ₹528,992 Puducherry Desilting the Pillayarkuppam Authuvoikkal from Pillayarkuppam Anicut to Pathukannu Junction in Oussudu Constituency, Puducherry. 22 Jul 2026, 04:00 PM
← Prev Page 21 of 25 Next →