Live tenders

348 tenders found for “bridge”.

Value ₹ EMD ₹
Construction of H.L. bridge over Local Nallah on Dasigaon to Bandhanpala RD road in the district of kalahandi under SBY for the year 2025-26
live
Ce Rw I
Closes in 10 days ₹29,354,000 Bhawanipatna/Kalahandi 2026_CERWI_139986_1 23 Sep 2026, 05:00 PM
Construction of H.L.Bridge over Local Nallah on Sagunbadi to Baner road in the district of Kalahandi under SBY for the year 2025-26
live
Ce Rw I
Closes in 10 days ₹81,102,000 Dharmagarh/Kalahandi 2026_CERWI_139993_1 23 Sep 2026, 05:00 PM
Construction of H.L.Bridge over Mundra river on Badapodaguda to Mahajanguda Road in the district of Kalahandi under SBY for the year 2025-26
live
Ce Rw I
Closes in 10 days ₹56,072,000 Dharmagarh/Kalahandi 2026_CERWI_139987_1 23 Sep 2026, 05:00 PM
Construction of H.L. bridge over Local Nallah at 3rd Km on Supel to Surli road in the district of kalahandi under SBY for the year 2025-26
live
Ce Rw I
Closes in 10 days ₹66,402,000 Bhawanipatna/Kalahandi 2026_CERWI_139984_1 23 Sep 2026, 05:00 PM
Permanent Restoration of road from HS Degwar Maldhyan to Newly Constructed Bettar Nallah Bridge,Tehsil Haveli,District Poonch
live
PWD
Closes in 3 days 2026_PWDJK_323276_2 16 Sep 2026, 04:00 PM
Strengthening of existing kutcha in to RCC drain along main haul road in between old weigh bridge to water filling point north side of haul road under ROCP.
live
Eastern Coalfields Limited
Closes today ₹4,773,298 Rajmahal OCP 2026_ECL_364796_1 14 Sep 2026, 11:00 AM
Providing CAMC for Maintenance of 12 Nos. Road Weighbridges at Magadh OCP, M-S Area for a Period of One Year
live
Central Coalfields Limited
Closes in 1 day ₹1,696,282 Office of the Project Officer Magadh OCP, M-S Area 2026_CCL_364698_1 14 Sep 2026, 05:00 PM
Construction of RCC Foot Bridge over Khowai river at Sheoratali under Uttar Ramchandraghat GP of RD Khowai Division during the FY 2026-27 as per PWD SoR-2023
live
Chief Engineer, Rural Development Department
Closes in 2 days ₹22,445,636 As per DNIT 2026_CERDD_74989_3 16 Sep 2026, 03:00 PM
Comprehensive Annual Maintenance Contract CAMC Including Annual Verification and Stamping of two Weigh Bridges 50MT and 60 MT Capacity at Tetariakhar OCP Rajhara Area
live
Central Coalfields Limited
Closes in 1 day 2026_CCL_364772_1 14 Sep 2026, 05:00 PM
Construction of NH 59 Belpadar chowk to Lenjha via-Debhuin road
live
Ce Rw I
Closes in 8 days ₹138,313,590 Balangir 2026_CERWI_139918_1 21 Sep 2026, 05:00 PM
Construction of RCC Wall connecting abutments of existing 2 No HLB (Patiala-Rajpura Section U/s Bridge and Rajpura-Patiala Section D/s Bridge) crossing Badi Nadi on Patiala-Rajpura Road and extension of existing wing walls upto river bank.
live
Ce-Pwd(B and R)
Closes today Patiala 2026_CEPW_174584_1 14 Sep 2026, 11:00 AM
Salepali to Airstrip Chhak (Badangomunda)-Road
live
Ce Rw I
Closes in 8 days ₹174,243,890 Balangir 2026_CERWI_139898_1 21 Sep 2026, 05:00 PM
Construction of Protection wall wahidina Bridge Pyt Bandipayeen B Under ADP-DDC Block Wagoora, Year 2026-27
live
Rural Development and Panchayati Raj
Closes in 3 days ₹459,000 Baramulla 2026_RDPR_322994_1 16 Sep 2026, 06:00 PM
Construction of Hl RCC Bridge Over Koel River at Ochwahi on Mongra Pidhdhe Road Under Mongra Panchayat in Barwadih Block Latehar District
live
RDD Special Division
Closes in 11 days ₹74,456,231 Latehar 2026_RDSPL_118107_1 24 Sep 2026, 05:00 PM
Weigh Bridge 10x10 Installatation of 100 MT capacity weighbridge with civil work, Dismantling of existing 60 MT capacity weighbridge Dabwali
live
Haryana Board Corporation
Closes in 1 day ₹9,538,947 Mandi Dabwali Rania 2026_HBC_544737_1 15 Sep 2026, 12:00 PM
Construction of 30.00M Steel Composite Girder Bridge at KM 31.600 Design Chainage 243.46 on Gangotri Rishikesh Section of NH34 on EPC Mode in the State of Uttarakhand Under EPC Mode
live
Dte General Border Roads Organisation
Closes in 32 days ₹52,200,000 T KM 31.600 Design Chainage 243.46 on Gangotri Ri 2026_BRO_787261_1 15 Oct 2026, 05:00 PM
Construction of Foot Bridge at Kandi
live
PWD
Closes in 3 days ₹3,884,000 tangdar 2026_PWDJK_322999_1 16 Sep 2026, 04:00 PM
Construction of Foot Bridge at Dildar
live
PWD
Closes in 3 days ₹3,884,000 tangdar 2026_PWDJK_322999_2 16 Sep 2026, 04:00 PM
Estimate for construction of ramp on bridge at RD 37030 of Bhinder Disty
live
Department of Water Resources
Closes today ₹842,538 Xen Jandiala Ubdc Asr 2025_WR_142630_3 14 Sep 2026, 12:00 PM
Dredging of Ratnachira river from Sriramchandrapur bridge to Jamunakuda Bridge under Doab-VII.
live
CE,Drainage,Cuttack
Closes in 11 days ₹80,157,537 Satyabadi and Puri Sadar 2026_CEDC_139809_1 24 Sep 2026, 06:00 PM
← Prev Page 13 of 18 Next →