Carrying out borehole drilling (boreholes) from Km 29 to Km 58 (total length 29 km) for conducting surveys and investigations for preparing the Design Estimates and Detailed Project Report (DPR) for the project to supply Krishna River water to drough
CE-Water Resources Dept. Pune||Maharashtra Krishna Valley Development Corporation||Pune Irrigation Project Circle Pune||EE Irrigation Project Investigation Division, Pune
Submissions for this tender have closed. We check the source portal hourly and will show the Award of Contract (AOC) outcome here as soon as it's published — track this tender to be notified.
Submission deadline has passed.
Amendments (corrigendum)
This tender has been amended. Always re-check the official portal before bidding.
- Opening date 2026-08-31 12:00 → 2026-09-02 12:00 28 Aug 2026
- Closing date 2026-08-28 18:15 → 2026-08-31 18:15 28 Aug 2026
Tender timeline
Work description
Carrying out borehole drilling (boreholes) from Km 29 to Km 58 (total length 29 km) for conducting surveys and investigations for preparing the Design Estimates and Detailed Project Report (DPR) for the project to supply Krishna River water to drough
Financial summary
EMD is a refundable deposit; tender fee is non-refundable. Compare against the estimated tender value to plan your bid.
AI tender analysis
Sign in to run an AI analysis — costing, best bid, eligibility and a full document review.